| DEI-METKA |
Complete Construction of Gas Turbine, Lube & Seal Oil System, Auxiliary Boiler and Air Cooled Heat Exchanger of Combined Cycle on one axle Thermoelectric Power Station, installed capacity 436,6 MW, at the Power facilities of KORINTHOS POWER in Agioi Theodori Corinthias
Seal Oil System of Combined Cycle on one axle Thermoelectric Power Station, installed capacity 436,6 MW, at the Power facilities of KORINTHOS POWER in Agioi Theodori Corinthias
|
| |
|
| DEI-METKA |
Complete Construction of Auxiliary Mechanical and Electrical Systems of the project: "Design, supply, installation, erection, commissioning Hydro-turbines, Governors, Valves, Generators, Transformers, 150kV Switchyard Equipment, MV Switchgear, Draft Tube Gates, Gantry Crane and Auxiliary Electromechanical Equipment for two (2) units 70 MW each, one (1) unit 4 MW and one (1) unit 500KW at Papadia "
|
|
| |
Our company has developed strategic partnerships with pioneering companies around the world in respective fields of interest.
|
| |
Don't hesitate to contact us!
|
| |
ASPATE S.A.
Aspasias Kapsala 4,
15125, Maroussi,
Athens, Greece
tel: +30 210 61 07 465-6
fax: +30 210 61 07 115
email: info@aspate.gr |
|